Windows Replacement Project ‐ Phase 2

Phase 1 of the Windows Replacement Study – “Investigation and Repair Concept Definition” – was completed in January 2022. Results were reported in:
o Several monthly HOA meetings
o Mailings to homeowners
o A Town Hall meeting
o Posting on Bay Scene website…

Read More
Jimmy Gottlieb
Balcony Stucco Repair Project

We have discovered, in a few specific units, that the joint sealant between the balcony floor and outer balcony wall below the railing has deteriorated to the point that water intrusion is damaging the stucco above the balcony in the unit below. The HOA will be reaching out to a few contractors…

Read More
Jimmy Gottlieb
Bay Scene Structural Condition Assessment - March 11, 2022, Update 1

As discussed at the last several HOA meetings, Bay Scene has retained Degenkolb Engineers, a structural engineering firm, to evaluate the condition of our buildings. After multiple site visits, the engineers found some areas of concrete deterioration in the slab above our parking structure, apparently caused by decades of water leaking into the crawl space area (what we call “the catacombs”) directly above the garage. You may…

Read More
Jimmy Gottlieb
Window Replacement Project Update

In late June, the Bay Scene HOA entered into an agreement with Whitmore Architects to investigate and test our existing curtain wall window system and develop conceptual designs and cost estimates for recommended window replacements or repairs…

Read More
Jimmy Gottlieb