Water Shut Off Notice TOWERS 3 & 4 ONLY- 02/10/2026 ~ 02/12/2016

The water shut-off will occur for three (3) consecutive days beginning Tuesday, February, 10, 2026 through Thursday, February 12, 2026 from 10:00 AM to 5:00 PM each day. This is required for the replacement of the Tower 3 and Tower 4 sewer mainlines.

Towers 1 and 2 will not be affected, and the restrictions outlined in this notice do not apply to these buildings.

During the water shut-off period for Towers 3 & 4 only, all plumbing fixtures must NOT be used, including but not limited to:

•Toilets
•Sinks
•Showers
•Dishwashers
•Washing machines
•Any other fixture that utilizes the drain or sewer line

The sewer mainlines will be open and exposed during this work. Any use of plumbing fixtures may result in wastewater being discharged into non-existent or open plumbing lines, which could contaminate the work area.

The plumbing repair and shut off will be conducted by:

Preferred Vendor
High Quality Plumbing
(619)392-4379

Thank you for your cooperation and patience during this project.

Jimmy Gottlieb